Tomberlain Floors
Flooring repair and installation
About the project
Our client was experiencing bouncing and loose floors throughout their living room and master bedroom. Upon inspection, we determined that the crawl space was not big enough, and the lumber used was not correct. The small crawl space area and high moisture content caused the structural floor joists to decay. The floor joists and sections of the main girder were replaced with new pressure treated lumber, and a vapor barrier was installed over the exposed soil subgrade. Upon structural completion, new waterproof laminate floors were installed.